Would you sell them for this mark up of 4 times? Or is that what the guy
selling them for you is asking? If the retailer marks up your price of $60
to $75 2 times(not an uncommon markup) you get a price of $120 to $150.
"Glenn Ashmore" wrote in message
news:syY7c.242$pM.89@lakeread04...
I should clarify. I would not do just one off either. I machine
stainless dinghy clamps 4 sets at a time because setup time is longer
than machining time. I would probably do at least a couple of dozen
each 6" and 8" in a run to get a whole day out of the setup. With well
planned use of the drop I could still keep the material cost under about
$6 for a 6" and maybe $8 for an 8" using McMaster prices for 5056
aluminum, 1/4-20 stainless bolts and adhesive backed Neoprene gasket
sheet. If bought in production quantities it would be a lot less.
These are not a complex machining job and aluminum is a lot easier to
machine than the 316 that I work with and there is no polishing to deal
with. You would need two jigs, a drill press and a mill. My shop is
not very sophisticated but assuming $60/hour: once the jigs are setup,
one man running manual machines could crank out at least 6 an hour so
the total fabrication cost might average $16 to $18 each. Allowing 4X
markup for overhead, profit, distribution and marketing they should be
able to retail them for about $60 to $75 each.
But price has little to do with cost so I guess there are enough people
out there ready to pay "marine" prices.
QLW wrote:
While $120 maybe a lot for this, it's not out of line. I've been
fabricating for most of my life and I'm here to state that NOTHING like
this can be built in 10 minutes as a "one off". Even if you have the
tooling to punch out the metal and all of the materials at hand it can't
be
done in 10 minutes. I have a very well equipped welding/machine shop
and if
a customer walked in the door right this second and ordered one of
these,
I'd estimated at least 2 hours to gather materials, layout and plasma
cut,
punch holes, tack weld bolts and make a gasket. And if I don't have the
right metal, bolts, gasket material, etc. on hand then add the time for
a
trip to pick them up. If I plan to make 50 of these then it's a
different
story, but then I have to stock them and suffer the loss of use of that
money that is tied up in materials and labor until they are sold. The
true
cost of building anything is far more than the cost of the material. I
have
a heap of money in machinery, shop building, utilities, etc. that have
to
added to the cost of everything that I sell. Otherwise, I just lose
money.
I would charge at least the same amount to make one of these.
When someone says to me, "it will only take you 10 minutes to do that"
(and
I've heard that often)...I say, "There's the shop. If you can make it in
10
minutes it's free, otherwise you pay me double shop rate"
Quinton
"Glenn Ashmore" wrote in message
news:sNN7c.132$pM.28@lakeread04...
WOW!!! $120 for a 6" aluminum plate, 8 bolts and a ring that I could
turn out in 10 minutes with $8 worth of material. I need to stop
selling anchors and spend more time in the shop!
Douglas Nikkila wrote:
Check out http://www.seabuilt.com/noflash.html. They make great access
plates. Even if you don't want to buy you will get some good ideas.
Douglas
--
Glenn Ashmore
I'm building a 45' cutter in strip/composite. Watch my progress (or lack
there of) at: http://www.rutuonline.com
Shameless Commercial Division: http://www.spade-anchor-us.com
--
Glenn Ashmore
I'm building a 45' cutter in strip/composite. Watch my progress (or lack
there of) at: http://www.rutuonline.com
Shameless Commercial Division: http://www.spade-anchor-us.com